Bismil Wastewater Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Diyarbakır Water and Wastewater Administration (DİSKİ)
Duration
30 months
June 2020 – December 2022
EU contribution (Euro)
11.427.000
Brief description of the project and main objectives
Construction of wastewater treatment plant
Improving the water quality of Dicle River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Overcoming the operational problems in the sewerage system through partial replacement of the wastewater network.
Location
Bismil (Diyarbakır)
Achievements / expected outputs
Wastewater treatment plant and wastewater collection system.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.
