Çarşamba Wastewater Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Samsun Metropolitan Municipality Water and Sewerage Administration (SASKİ)
Duration
24 months
May 2020 – May 2022
EU contribution (Euro)
12.846.000
Brief description of the project and main objectives
Construction of wastewater treatment plant
Improving the water quality of Yeşilırmak River and the Black Sea via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Location
Çarşamba (Samsun)
Achievements / expected outputs
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2048.
