Çarşamba Wastewater Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Samsun Metropolitan Municipality Water and Sewerage Administration (SASKİ)

Duration

24 months
May 2020 – May 2022

EU contribution (Euro)

12.846.000

Brief description of the project and main objectives

Construction of wastewater treatment plant
Improving the water quality of Yeşilırmak River and the Black Sea via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Location

Çarşamba (Samsun)

Achievements / expected outputs

With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2048.