Elbistan Wastewater Project
![](https://ipa.gov.tr/wp-content/uploads/proje-9-1.jpg)
Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Kahramanmaraş Water and Wastewater Administration
Duration
Wastewater Treatment Plant 30 months
March 2020 – September 2022
Sewerage Network 27 months
March 2020 – June 2022
EU contribution (Euro)
19.700.000
Brief description of the project and main objectives
Construction of wastewater treatment plant and sewerage network
Improving the water quality of the Ceyhan River by reducing the pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Overcoming the operational problems in the existing sewerage system
Location
Elbistan (Kahramanmaraş)
Achievements / expected outputs
Wastewater treatment plant and wastewater collection system.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.
![](https://ipa.gov.tr/wp-content/uploads/proje-7-2.jpg)