Elbistan Wastewater Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Kahramanmaraş Water and Wastewater Administration

Duration

Wastewater Treatment Plant 30 months
March 2020 – September 2022

Sewerage Network 27 months
March 2020 – June 2022

EU contribution (Euro)

19.700.000

Brief description of the project and main objectives

Construction of wastewater treatment plant and sewerage network
Improving the water quality of the Ceyhan River by reducing the pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Overcoming the operational problems in the existing sewerage system

Location

Elbistan (Kahramanmaraş)

Achievements / expected outputs

Wastewater treatment plant and wastewater collection system.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.