Giresun Wastewater Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Giresun Municipality
Duration
Wastewater Treatment Plant 27 months
December 2021 – March 2024
Wastewater Collection System 24 months
December 2021 – December 2023
EU contribution (Euro)
22.285.000
Brief description of the project and main objectives
Construction of wastewater treatment plant and wastewater collection system.
Improving the water quality of Black Sea via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Overcoming the operational problems in the sewerage system through construction of wastewater network.
Location
Giresun
Achievements / expected outputs
Wastewater treatment plant and wastewater collection system.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.