Iğdır Wastewater Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Iğdır Municipality
Duration
Wastewater Treatment Plant 24 months
July 2020 – July 2022
Wastewater Collection System 24 months
July 2020 – July 2022
EU contribution (Euro)
23.586.000
Brief description of the project and main objectives
Construction of wastewater treatment plant and wastewater collection system
Improving the water quality of Aras River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Location
Iğdır
Achievements / expected outputs
Wastewater treatment plant and wastewater collector network.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.