Iğdır Wastewater Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Iğdır Municipality

Duration

Wastewater Treatment Plant 24 months
July 2020 – July 2022

Wastewater Collection System 24 months
July 2020 – July 2022

EU contribution (Euro)

23.586.000

Brief description of the project and main objectives

Construction of wastewater treatment plant and wastewater collection system
Improving the water quality of Aras River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Location

Iğdır

Achievements / expected outputs

Wastewater treatment plant and wastewater collector network.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.