Kastamonu Wastewater Treatment Plant Project

Priority area

Water (infrastructure related activities) Environment and Climate Action

Beneficiary

Kastamonu Municipality

Duration

27 Months
December 2019 – March 2022

EU contribution (Euro)

13.707.000

Brief description of the project and main objectives

Construction of wastewater treatment plant
Improving the water quality of the Karaçomak Creek (which merges to Gökırmak and then to Kızılırmak river) via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Location

Kastamonu

Achievements / expected outputs

With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.