Kastamonu Wastewater Treatment Plant Project

Priority area
Water (infrastructure related activities) Environment and Climate Action
Beneficiary
Kastamonu Municipality
Duration
27 Months
December 2019 – March 2022
EU contribution (Euro)
13.707.000
Brief description of the project and main objectives
Construction of wastewater treatment plant
Improving the water quality of the Karaçomak Creek (which merges to Gökırmak and then to Kızılırmak river) via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Location
Kastamonu
Achievements / expected outputs
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.