Niksar Integrated Water Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Niksar Municipality

Duration

Wastewater Treatment Plant 24 months
April 2021 – April 2023

Water Supply and Wastewater Collection Systems 24 months
May 2020 – May 2022

EU contribution (Euro)

24.088.000

Brief description of the project and main objectives

Construction of wastewater treatment plant, water supply and wastewater collection systems.
Improving the water quality of Kelkit creek via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Overcoming the operational problems in the sewerage system through construction of wastewater network.

Location

Niksar (Tokat)

Achievements / expected outputs

Wastewater treatment plant, water supply and wastewater collection systems.
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.