Sivas Kızılırmak Right and Left Banks Wastewater Collector Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Sivas Municipality

Duration

26 months
October 2020 – December 2022

EU contribution (Euro)

15.500.000

Brief description of the project and main objectives

Construction of new wastewater collector lines and connection to the existing wastewater treatment plant.
Contributing to the improvement of public health by reducing the pollution load in Kızılırmak River

Location

Sivas

Achievements / expected outputs

With the construction of Kızılırmak right and left banks wastewater collectors, the needs of the region in terms of wastewater treatment services will be met until 2047.