Sivas Kızılırmak Right and Left Banks Wastewater Collector Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Sivas Municipality
Duration
26 months
October 2020 – December 2022
EU contribution (Euro)
15.500.000
Brief description of the project and main objectives
Construction of new wastewater collector lines and connection to the existing wastewater treatment plant.
Contributing to the improvement of public health by reducing the pollution load in Kızılırmak River
Location
Sivas
Achievements / expected outputs
With the construction of Kızılırmak right and left banks wastewater collectors, the needs of the region in terms of wastewater treatment services will be met until 2047.