Sorgun Wastewater Treatment Plant Project

Priority area
Water (infrastructure related activities) / Environment and Climate Action
Beneficiary
Sorgun Municipality
Duration
Wastewater Treatment Plant 20 months
December 2020 – August 2022
EU contribution (Euro)
8.024.000
Brief description of the project and main objectives
Construction of wastewater treatment plant.
Improving the water quality of Eğriöz River via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Location
Sorgun (Yozgat)
Achievements / expected outputs
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2048.
