Supply of Equipment for Improvement of Gas Network Infrastructures

Priority area

Market integration and the development of energy infrastructure

Project manager

Petroleum Pipeline Corporation (BOTAŞ)

Duration (month) + Start and End Dates

24 months
December 7, 2018 -December 1, 2020

EU contribution (euro)

6.807.725

Brief description of the project and main objectives

Increasing the sustainability and reliability of the natural gas transmission network.

Location

Ankara and various local stations

Achievements / expected outputs

Establishment and operation of a modular data center in the gas network system where data is collected from distribution points, also from compressor stations and pipeline valves
Acquisition and installation of new data center security products to add to the SCADA system
Establishment of steady state network simulation software, GIS data acquisition and network optimization capability
Obtaining real-time networking simulation software to enable it to operate online and offline
Procurement of a demand forecasting software compatible with the SCADA system to collect data simultaneously
Uzak terminal birimlerinin (RTU) ve yedeklerinin alınması
Taking remote terminal units (RTU) and their backups. Increasing the sustainability and reliability of the natural gas transmission network