Supply of Equipment for Improvement of Gas Network Infrastructures

Priority area
Market integration and the development of energy infrastructure
Project manager
Petroleum Pipeline Corporation (BOTAŞ)
Duration (month) + Start and End Dates
24 months
December 7, 2018 -December 1, 2020
EU contribution (euro)
6.807.725
Brief description of the project and main objectives
Increasing the sustainability and reliability of the natural gas transmission network.
Location
Ankara and various local stations
Achievements / expected outputs
Establishment and operation of a modular data center in the gas network system where data is collected from distribution points, also from compressor stations and pipeline valves
Acquisition and installation of new data center security products to add to the SCADA system
Establishment of steady state network simulation software, GIS data acquisition and network optimization capability
Obtaining real-time networking simulation software to enable it to operate online and offline
Procurement of a demand forecasting software compatible with the SCADA system to collect data simultaneously
Uzak terminal birimlerinin (RTU) ve yedeklerinin alınması
Taking remote terminal units (RTU) and their backups. Increasing the sustainability and reliability of the natural gas transmission network