Trabzon Water Supply Project

Priority area

Water (infrastructure related activities) / Environment and Climate Action

Beneficiary

Trabzon Water and Wastewater Administration (TİSKİ)

Duration

48 months
March 2020 – March 2024

EU contribution (Euro)

18.003.000

Brief description of the project and main objectives

Construction of water supply system
Providing sufficient and continuous drinking water to the population according to EU standards and reducing water losses from leakages.

Location

Ortahisar (Trabzon)

Achievements / expected outputs

With the construction of water supply system, the needs of the region in terms of drinking water services will be met until 2047.