Yüksekova Wastewater Treatment Plant Project

Priority area

Water (Infrastructure Related Activities) / Environment and Climate Action

Beneficiary

Yüksekova Municipality

Duration

30 months
June 2020 – December 2022

EU contribution (Euro)

8.461.000

Brief description of the project and main objectives

Wastewater treatment plant construction
Improving the water quality of Merkez Creek via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.

Location

Yüksekova (Hakkari)

Achievements / expected outputs

With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.