Yüksekova Wastewater Treatment Plant Project

Priority area
Water (Infrastructure Related Activities) / Environment and Climate Action
Beneficiary
Yüksekova Municipality
Duration
30 months
June 2020 – December 2022
EU contribution (Euro)
8.461.000
Brief description of the project and main objectives
Wastewater treatment plant construction
Improving the water quality of Merkez Creek via reducing pollution load caused by untreated wastewater discharge in the existing situation and contribute to improvement of public health.
Location
Yüksekova (Hakkari)
Achievements / expected outputs
With the construction of the wastewater treatment plant, the needs of the region in terms of wastewater treatment services will be met until 2047.
